Wednesday 30 January 2013

Apartment reno is finally done!

So it has been a very busy month for us, well 3 months actually.  We are still finishing the last touches on our new apartment, our new tenant moves in on Friday.  This new apartment of ours has been completely gutted\updated over the last three months.
our ripped out kitchen, with the wall removed and the new sub flooring installed.
We have ripped out all the existing carpeting and installed a new sub floor with beautiful new floors on top.  We removed the old kitchen took out a wall and designed a new kitchen with all white shaker style cabinetry.  We have a new granite counter tops with under mount sinks and new stainless appliances. 


We are almost done in the kitchen

The bathroom we only did a partial gut job.  we removed all the flooring and the old toilet.  We tried to glaze the existing steel tub and in the end it turned out ok.  The floor that we put the bath is amazing.  It is a flexible vinyl that molds to the floors, with a house that has seen more than 100 years I can't tell you how important that is. 

super happy about how the floors turned out.
Overall, our apartment reno was a huge success.  We are very exceited about of new tenant moving in. 
Rebecca

No comments:

Post a Comment